fishing for words

(and tossing out random thoughts)

up close with the WP&YR, Skagway, Alaska

Leave a comment

WP&YR Engine

White Pass & Yukon Route Railroad engine in Skagway. Completed in 26 months and finished at the end of the Yukon Gold Rush, the narrow gauge WP&YR climbs nearly 3,000 feet in 20 miles with grades up to 3.9%, two tunnels and multiple bridges and trestles. The WP&YR’s total length is 100 miles and connects the deep water port at Skagway with Whitehorse, Yukon. Close in 1982 with the decline of the Yukon’s mining industry, it reopened in 1988 as a tourism operation. June 15, 2017

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s